Sort by:
The Faraday Centre Reviews
Craig M, 05 Nov 2021
Redcar
Really enjoyed the S4, lots of good information was delivered.
Darrell E, 05 Nov 2021
Redcar
Course very good lay out, and both Andy and Ged presented it very well. Could possibly do with heating in the building
Mark H, 05 Nov 2021
Redcar
Heating needs to be fixed ASAP. Good knowledge from the tutor.
David A, 05 Nov 2021
Redcar
Course is not as basic as described. Was told the course was for people with zero knowledge on electrics but as someone with a basic knowledge of electric I still found it difficult to understand. Although the tutor has great knowledge about the subject the way it is delivered and explained was hard for me to understand.
Lewis W, 05 Nov 2021
Redcar
Course has some interesting knowledge in it, but very irrelevant to the job role. The catering isn’t the best either. Instructor is very knowledgeable tho and made the content of the course so far easy to understand
Jamie C, 05 Nov 2021
Redcar
Building is really cold, course was a bit too much information in a small space of time in relation to what we were expected to know for the exam.
Dom C, 05 Nov 2021
Redcar
Food disappointing. Had to go out most days for an alternative. Good instructor with great knowledge and have learnt a lot from his knowledge but the information you have to learn in such little time for the test is a lot . Ie remembering what dates legislation came out. Even if the legislation says 1992 in the title, in the description it came it in 1990 you would have to learn that date it is confusing.
Armstrong O, 04 Nov 2021
Redcar
Course provide candidates with the specific knowledge and skills to carry out HV testing
Lewis C, 03 Nov 2021
Redcar
Course was really enjoyable, Steve and Gary were excellent, friendly and professional throughout. Would definitely recommend the course but get the heating turned on haha.
christopher g, 03 Nov 2021
Redcar
Steve and Gary both polite, very nice and knowledgeable lectures. Venue was very clean and tidy only issue was temperature heating wasn’t working very well due to building being an old data centre.