WTCT - Wind Farm HV Cable Termination

Description

This is a HV termination course targeted at the wind farm industry, terminations are not manufacturer specific. The cable terminations will also be heat and cold shrinkable and utilize mechanical terminals unless otherwise specified. Please note: this course is an introduction to terminating and is not intended to be taken as a full trade course.

What you will learn

  • Cable preparation
  • Stress control
  • Cable terminations
  • Earthing
  • Termination failures
  • Cable testing
  • Cable introduction & regulations
  • Cable construction
  • Practicals:
  1. Cable preparation
  2. Installing 12kv indoor termination for screened single core insulated cable (Heat shrink)
  3. Installing 24kv indoor termination for screened single core insulated cable (Cold shrink)
  4. Installing 24kv Pfisterer separable screen T connector

 

Further information

The Faraday Centre
Provider:
The Faraday Centre
Duration:
3 Days
Locations:
Redcar

Contact Information

The Faraday Centre

The Annexe Building South
The Wilton Centre
Redcar
TS10 4RF

Credentials

Locations